Project Gantt

A basic project gantt chart is visualized by clicking on 'Gantt' in the project window.

The user can select in the drop down list box which projects or subprojects are visualized and can indicate in the check box if only the main project level or all of the subprojects are visualized.

The time scale (period) is automaically determined by the system. A specific period can be imposed by clicking on the check box in the upper right corner of the window and selecting the appropriate dates.

After changes in the visualization criteria, the view is updated by clicking the return arrow.